September 2008 - as advertised on ebay
October 2008 - bringing it home
November 2008 – the first strip down
November 2008 - the new chassis
November 2008 – more stripdown
November 2008 – the new firewall
November 2008 – throttle linkage details
November 2008 – bringing the new firewall home
November 2008 – stripping the second vehicle down
December 2008 – finishing the second vehicle stripdown, carting the relics to the tip
December 2008 – stripping the original vehicle down to a rolling chassis with engine/gearbox
January 2009 – more stripping
down, cleaning the engine/gearbox
March 2009 – abrasive blasting and painting
March 2009 – removing the engine and gearbox
April 2009 – stripping down the last of the chassis
May 2009 – sorting out the rims and tyres
May-July 2009 – mechanical repairs
June-July 2009 – painting the chassis
June 2009 – fixing the firewall
July 2009 – painting the bits hanging off the chassis
July 2009 – more chassis painting
August 2009 – a rolling chassis
August 2009 – cleaning up the steering wheel
August 2009 – repairing the fuel tank
October 2009 – front door hinges
October 2009 – brake lines installed
December 2009 – re-install engine and gearbox
March 2010 – re-install the shrapnel on the engine
April 2010 – starting up the engine
May 2010 – sorting out the rear suspension